Kade Offices

Kade Offices, a round brick silo converted into offices

Place

Rotterdam

Type

Workplace

Completed

2024

Client

Kade Development

Floor area

9,800 m²

Offices for 300 people in a former grain silo on the quay, completed in 2024.

The brief

The silo was built in 1931 and stood empty for twenty years. The owner asked us whether it was worth keeping. We thought it was.

The design

We kept the brick shell and the concrete bins, and cut new floors in between them. The round bins became meeting rooms and stairs. A new glass floor on top holds the canteen, with a view down the river.

The result

About 300 people have worked here since spring 2024. Keeping the structure saved roughly 3,000 tonnes of CO₂ compared with a new building of the same size.

From drawing to building

Drag across the image to compare the drawing with the finished building.

Kade Offices, a round brick silo converted into offices
Drawing
Built
←→
Office floor inside the old silo with brick columns
Kade Offices floor under the old timber beams
Meeting table against the silo brick

Create a free website with Framer, the website builder loved by startups, designers and agencies.